Eastgate Shopping Centre Phase 1 and 2
Details Phase 1 (2020): 1 MW [AC] or 1.219MWp grid-tied solar PV parkade solution with generator integration, resulting in significant electricity cost savings for the Shopping Centre, while…
Details Phase 1 (2020): 1 MW [AC] or 1.219MWp grid-tied solar PV parkade solution with generator integration, resulting in significant electricity cost savings for the Shopping Centre, while…
Details Phases 1 and 2 of the Solareff solar PV solution at Brito's Meat Distribution in Cape Town, bringing the total grid-tied solar PV solution size to 894kWp.…
Details The Midstream Ridge is a 408.65kWp Grid-Tied Solareff solar PV solution which has been implemented as a significant step towards reducing their carbon footprint and overall operating…
Details The Turbine Hall project, owned by Atterbury in partnership with Diversity Fund, is a 110kWp roof-top grid-tied solar PV solution in Johannesburg, Gauteng.
Details Our record-breaking 6.8MWp solar rooftop PV plant at Boardwalk Inkwazi in Richard’s Bay was the largest rooftop installation in Africa at the time of installation. For this…
Details Phases 1 and 2 of the solar PV solution at Spiro's Mega Mica in Durbanville. In 2018 Solareff installed a 99kWp rooftop solution; in 2022 phase 2…
Details 1221.5kWp grid-tied solar PV solution. The inverters are situated at multiple locations in order to optimise the performance of the system. This solution was commissioned 2 months…
Details Kempton Park100.8kWp grid-tied solar PV solutionThis installation is phase 1 of their solar PV roll-out plans